Karakütük Serhat, ÖRNEK MUSTAFA ARSLAN |
A goal programming approach to lean production system implementation | JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, (), 0-0. |
(SCI-Expanded) 2022 |
ÖRNEK MUSTAFA ARSLAN,ÖZTÜRK CEMALETTİN,Sugut Ipek |
Integer and constraint programming model formulations for flight-gate assignment problem | Operational Research, 22(1), 135-163. |
(SCI-Expanded) 2022 |
Karakütük Serhat, AKPINAR ŞENER, ÖRNEK MUSTAFA ARSLAN |
An application of a circular economy approach to design an energy-efficient heat recovery system | JOURNAL OF CLEANER PRODUCTION, 320(), 0-0. |
(SCI-Expanded) 2021 |
ÖRNEK MUSTAFA ARSLAN,ÖZTÜRK CEMALETTİN,Sugut Ipek |
Model-based heuristic for counter assignment problem with operational constrains: A case study | Journal of Air Transport Management, 77(), 57-64. |
(SCI) 2019 |
ÖZTÜRK CEMALETTİN,SARGUT FATMA ZEYNEP,ÖRNEK MUSTAFA ARSLAN,TÜRSEL ELİİYİ DENİZ |
Optimisation and heuristic approaches for assigning inbound containers to outbound carriers | Maritime Policy Management, 44(7), 825-836. |
(SSCI) 2017 |
ÖZTÜRK CEMALETTİN,ÖRNEK MUSTAFA ARSLAN |
OPTIMISATION AND CONSTRAINT BASED HEURISTIC METHODS FOR ADVANCED PLANNING AND SCHEDULING SYSTEMS | INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 23(1), 26-48. |
(SCI) 2016 |
YETKİN EKREN BANU,ÖRNEK MUSTAFA ARSLAN |
Determining optimum s S levels of floor stock items in a paint production environment | Simulation Modelling Practice and Theory, 57(), 133-141. |
(SCI) 2015 |
ÖZTÜRK CEMALETTİN,ÖRNEK MUSTAFA ARSLAN,Hnich Brahim |
Cyclic scheduling of flexible mixed model assembly lines with parallel stations | Journal of Manufacturing Systems, 36(), 147-158. |
(SCI) 2015 |
ÖZTÜRK CEMALETTİN,ÖRNEK MUSTAFA ARSLAN |
Operational Extended Model Formulations for Advanced Planning and Scheduling Systems | Applied Mathematical Modelling, 38(1), 181-195. |
(SCI) 2014 |
ÖZTÜRK CEMALETTİN,TUNALI SEMRA,ÖRNEK MUSTAFA ARSLAN,HNICH BRAHIM |
Balancing and Scheduling of Flexible Mixed Model Assembly Lines with Parallel Stations | Int. Journal of Advanced Manufacturing Technology, 67(9), 2577-2591. |
(SCI) 2013 |
ÖZTÜRK CEMALETTİN,TUNALI SEMRA,ÖRNEK MUSTAFA ARSLAN,BRAHIM HNICH |
Balancing and Scheduling of Flexible Mixed Model Assembly Lines | CONSTRAINTS, 18(), 434-469. |
(SCI-Expanded) 2013 |
ÖZTÜRK CEMALETTİN,ÖRNEK MUSTAFA ARSLAN |
A MIP Based Heuristic for Capacitated MRP Systems | COMPUTERS & INDUSTRIAL ENGINEERING, 63(4), 926-942. |
(SCI-Expanded) 2012 |
ÖZTÜRK CEMALETTİN,TUNALI SEMRA,ÖRNEK MUSTAFA ARSLAN,HNICH BRAHIM |
Simultaneous Balancing and Scheduling of Flexible Mixed Model Assembly Lines with Sequence Dependent Setup Times | Electronic Notes in Discrete Mathematics, 36(1), 65-72. |
(SCI) 2010 |
ÖRNEK MUSTAFA ARSLAN, ÖZPEYNİRCİ SELİN, ÖZTÜRK CEMALETTİN |
A Note on A Mixed Integer Programming Model for Advanced Planning and Scheduling | European Journal of Operational Research, 203(3), 784-785. |
(SCI) 2010 |
ÖZTÜRK CEMALETTİN,ÖRNEK MUSTAFA ARSLAN |
Capacitated lot sizing with linked lots for general product structures in job shops | Computers and Industrial Engineering, 58(1), 151-164. |
(SCI) 2010 |
TÜRSEL ELİİYİ DENİZ,ÖRNEK MUSTAFA ARSLAN,KARAKÜTÜK SERHAT |
A vehicle scheduling problem with fixed trips and time limitations | International Journal of Production Economics, 117(1), 150-161. |
(SCI) 2009 |
KABAK ERKAN, ÖRNEK MUSTAFA ARSLAN |
An improved metric for measuring multi item multi level schedule instability under rolling schedules | Computers and Industrial Engineering, 56(2), 691-707. |
(SCI) 2009 |
EDİS RAHİME, ÖRNEK MUSTAFA ARSLAN |
A tabu search based heuristic for single product lot streaming problems in flow shops | International Journal of Advanced Manufacturing Technology, 43(11), 1202-1213. |
(SCI) 2009 |
EDİS RAHİME, ÖRNEK MUSTAFA ARSLAN |
Simulation analysis of lot streaming in job shops with transportation queue disciplines | Simulation Modelling Practice and Theory, 17(2), 442-453. |
(SCI) 2009 |
YETKİN EKREN BANU,ÖRNEK MUSTAFA ARSLAN |
A simulation based experimental design to analyze factors affecting production flow time | Simulation Modelling Practice and Theory, 16(3), 278-293. |
(SCI) 2008 |
ÖRNEK MUSTAFA ARSLAN, CENGİZ ÖZGÜR |
Capacitated lot sizing with alternative routings and overtime decisions | International Journal of Production Research, 44(24), 5363-5389. |
(SCI) 2006 |
ÖRNEK MUSTAFA ARSLAN, COLLIER PETER |
The determination of in process inventory and manufacturing lead time in multi stage production Systems | International Journal of Operations and Production Management, 8(1), 74-80. |
(SCI-Expanded) 1988 |
COLLIER PETER, ÖRNEK MUSTAFA ARSLAN |
A mathematical model for energy and in process inventory assesment in a manufacturing system | Applied Energy, 13(14), 265-280. |
(SCI) 1983 |